Hello my friends, wherever you are, I hope you are in good health.
This time I'm still in a collection of photos from the past year, which I once archived in my cellphone's Documents folder, because for me these photos are very important even though they look ordinary. But at some point in the future if there is an error in the examination or in other matters. I can prove that our village has received an inspection team and here they state that the construction of the village is done very well, and in accordance with the plan. And these words I will keep in memory with real truth, along with the pictures I have taken on their arrival. And I will archive this again, by me making it, as a post in this beloved community. This picture shows the inspection of Village activities at the end of the year by the Aceh Jaya District Inspectorate.
They came with a Budget Plan (Rab) and also saw the Accountability Report (LPj). Concerning the use of Village Funds provided by the Central Government. Through each district. And the Regency government before channeling funds to the Village account. The government issued a Perbub. Regent Regulation. Within these rules. There are fields that allow according to the rules regarding the use of Village funds. So that the village funds that have been given are right on target.
Therefore they from the Inspectorate team have been assigned by the Regent to go down to the village, to see firsthand the activities that have been carried out by the village. And it's not just our village that they check. They even visited all the villages in Aceh Jaya district. The aim is to foster the Village, if there are errors in implementation, they are willing to help and fix them. So that it does not occur in the implementation of development at the village level. So Dealing with the realm of law. Therefore they continue to check all forms of reports from the person in charge. To see if anyone is playing with corruption or not. However, many villages do not want to use village funds more towards corruption.
As the head of the village, he works truthfully and strictly follows the rules that have been issued by the local district head
So, what is checked in the village?
There are three items. First, they inspected the construction of box culverts with a size of 2 x 12 meters. With a thickness of 20 cm. Depth 1.5cm. And they adjust the Accountability Report, with the work that has been carried out. After checking, the results are very appropriate and very good, and
Culvert inspection or Box Culvert as I show in the picture above.
Second, they visited the land where the oil palm seeds were planted. When they checked there was a slight deficiency and it was not in accordance with the LPJ Accountability Report. In the report the number of seeds according to the location of the area of 1 hectare is also appropriate. But there are a few things that don't fit, that is, a fence is not put up to protect the oil palm seedlings so pests don't easily disturb them. But here they categorically told us. What is lacking, it must be corrected before it becomes a problem in the future. And it must adjust to the budget budgeted in the APBG. And also they said to be more careful not to get caught in the realm of law.
The third. They also see development, repair the road leading to the farmers' plantations. that has been carried out by the TPK Activity Implementation Team. And according to their inspection, the results of the activities that have been checked. very appropriate and right on target. Even when they measure. There are advantages of the planned target. But it really does a very good job and fits perfectly as planned.
But here I show pictures of repairing roads or road filling from the start of implementation. And there are also finished drawings.
This is called road construction that has been completed.
Thank you and see you again on another occasion.
Greetings from @ajirdeal